UNRWA – Annual report of the Commissioner-General – Addendum

UNITED NATIONS

GENERAL

ASSEMBLY

Forty-first Session

Official Records

ADDENDUM

Supplement No. 13

(A/41/13)

October 1986

NEW YORK

REPORT OF THE COMMISSIONER-GENERAL OF THE UNITED NATIONS RELIEF

AND WORKS AGENCY FOR PALESTINE REFUGEES IN THE NEAR EAST

Addendum

1. This addendum to the Commissioner-General's report to the General Assembly 1/ contains information on the financial results in 1985, the financial performance to date in 1986 and on the Agency's proposed budget for 1987.

2. Direct government assistance to Palestine refugees is provided by the governments in the area of operations. Information on this assistance, shown as reported by the Governments concerned, is given in annex II.

I.  FINANCIAL RESULTS IN 1985

3. With the exception of 1984 when the Agency received a special one-time grant of $8.9 million following the closure of the United Nations Special Emergency Operations Trust Fund, regular contributions to the Agency showed a decline each year from 1980 to 1985. At the beginning of 1985, total regular contributions to the Agency were only $164 million, some $26 million less than in 1980.  The reduction in income was such that the Commissioner-General had no recourse but to severely reduce the budget for i985 and to make a special appeal to Governments for additional contributions. A number of Governments responded to the special appeal and by the close of 1985 the Agency's income for the year totaled $182 million. The Agency was able, therefore, to close the gap between income and expenditure in its General Fund substantially, ending the year with an excess of expenditure over income of only $1.2 million, which was met from its working capital.

II.  FINANCIAL PERFORMANCE IN 1986

4. The Agency's consolidated budget estimates for 1986 were $191.2 million, of which $170.5 million was for the General Fund, $13.1 million for Project Funds and $7.6 million for the Capital Construction Fund. 2/ This budget, adjusted to reflect the exchange rates prevailing in December 1985, was authorized for expenditure by the Commissioner-General.

5. As at the date of this report, the gap between income and 1986 estimated expenditure is $9 million, of which $2 million relates to the General Fund and $7 million to the Capital Construction Fund. The Agency has informed its major donors of the level of 1986 income to date (see annex I) and is hopeful that the additional contributions required for 1986, in particular for the General Fund, will be pledged.

III.  MEDIUM-TERM PLAN

6. The Agency embarked in 1986 on its first multi-year planning exercise.  In order to provide for the orderly development of the three substantive programmes of the Agency – education, health and relief services – and to provide donors with a forecast of the level of financing, that will be required over the planning period, the Agency has prepared a three-year medium-term plan. This plan will be a rolling plan, that is, it will be revised annually by adding a year and dropping the current year. The plan contains a description of the objectives of each programme and sub-programme, the strategies that will be followed to meet the objectives and the methods of evaluating the achievement of the objectives. The plan will thus form the basis for the policies that will govern the preparation of the Agency's annual budgets.

IV.  PROPOSED BUDGET FOR 1987

7. Following the practice adopted in 1985, UNRWA's proposed 1987 budget estimates are being submitted during the forty-first session of the General Assembly as an addendum to the Commissioner-General's report. These estimates are subdivided into three sections: the General Fund, Project Fund and Capital Construction Fund requirements.

A.  Consolidated budget estimates

8. The consolidated budget estimates for 1987, as shown in table 1 (General Fund, Project Fund and Capital Construction Fund), are $200.3 million, an increase of $9.1 million or 4.8 Per cent over the 1986 approved budget. Table 2 contains a comparison of the 1987 budget estimates with the 1986 approved budget by type of expenditure.

9. The preparation of the 1987 budget has been guided by the policies and strategies developed in the Agency's 1987-1989 medium-term plan which also sets out the projected income needs of the Agency over the period. These projections reflect a realistic view of the income the Agency considers it would be possible raise from contributing Governments and others. The meeting of major donors in May 1986 endorsed these projections of income and it is on this basis that the proposed budget for 1987 has been prepared. The policy assumptions on which UNRWA's 1987 budget estimates have been based are that all administrative and support services would be held at the same level as 1986 and that growth in the three substantive programmes would be limited to projections of population increases as set out in the medium-term plan.

B.  General Fund

10. The General Fund budget represents the resources needed to operate the continuing major programmes of the Agency. It includes the staff and other costs necessary to maintain the education, health and welfare services that the Agency provides to serve two million Palestine refugees. Each of these programmes is described in greater detail in the sections that follow.

11. The 1987 General Fund budget estimates amount to $178.3 million, of which $163.0 million represents cash expenditure and $15.5 million expenditure of donated food commodities and services. These figures show an increase of $7.9 million or 4.6 per cent over the approved General Fund budget for 1986.

Table 1.  1986 APPROVED BUDGET AND 1987 PROPOSED BUDGET ESTIMATES

         (Thousands of United States dollars)

1986

APPROVED BUDGET a/

1987

PROPOSED ESTIMATES

Cash

In kind

Total

Cash

In kind

Total

A.

General Fund

  I.

Education services

Elementary education

Preparatory education

Vocational and professional training

Other activities

 52 057

 35 541

  7 951

  4 538

     21

      7

    838

    797

  52 078

  34 548

   8 789

   5 335

   53 659

   35 175

    8 240

    4 082

      12

      14

     791

     762

    53 676

    35 189

     9 031

     4 844

Total I

 99 087

  1 663

 100 750

  101 156

   1 584

   102 740

 II.

Health services

Medical services

Environmental sanitation

 17 924

  6 308

    398

    476

  18 322

   6 784

   18 211

    6 219

     381

     533

    18 592

     6 752

Total II

 24 232

    874

  25 106

   24 430

     914

    25 344

III.

Relief services

Special hardship assistance

Relief and welfare services

Shelter

  2 384

  3 728

    629

 10 119

      1

    152

  12 503

   3 729

     781

    2 818

    3 552

      638

  12 390

       1

     270

    15 208

     3 553

       908

Total III

  6 741

 10 272

  17 013

    7 008

  12 661

    19 669

 IV.

Operational services

Supply and transport services

Architectural and engineering

  services

  7 142

 

  1 064

    270

      –

   7 412

   1 064

    7 223

    1 258

     290

       –

     7 513

     1 258

Total IV

  8 206

    270

   8 476

    8 481

     290

     8 771

  V.

Common services

General management

Administration

  5 828

 13 316

      –

      –

   5 828

  13 316

    8 317

   13 598

       –

       –

     8 317

    13 598

Total V

 19 144

      –

  19 144

   21 915

       –

    21 915

General Fund, Total

157 410

 13 079

 170 489

  162 990

  15 447

   178 439

B.

Project Fund

Education services

Health services

Relief services

  2 862

  4 858

    271

      –

  5 101

      –

   2 862

   9 959

     271

    3 031

    4 037

      327

      77

   6 158

       3

     3 108

    10 195

       330

Project Fund, Total

  7 991

  5 101

  13 092

    7 395

   6 238

    13 633

C.

Capital Construction Fund

Education services

Health services

Relief services

Operational services

  6 463

    760

    359

     50

      –

      –

      –

      –

   6 463

     760

     359

      50

    5 902

    1 919

      325

      126

       –

       –

       –

       –

     5 902

     1 919

       325

       126

Capital Construction Fund, Total

  7 632

      –

   7 632

    8 272

       –

     8 272

GRAND TOTAL

173 023

 18 180

 191 213

  178 657

  21 687

   200 344

a/ The 1986 budget figures have been reclassified to conform with the current presentation.

C.  Project Fund

12. UNRWA continues to implement two types of projects: ongoing projects that are fully funded by special contributions such as those shown in annex III and construction projects that provide new or expanded facilities for the Agency's programmes.  Funding for ongoing projects is estimated at $13.6 million in 19817 an increase of $500,000 over 1986 due to an increase in the valuation of donated food commodities and a small expansion in the number of refugees benefiting from the supplementary feeding programme.

D.  Capital Construction Fund

13. The Capital Construction Fund consists of requirements for the replacement of unsatisfactory facilities and for new facilities to meet the needs brought about by the growth in the refugee population. Funds will be used to build new schools, health clinics, health sub-centres, mother-and child health care-units, sewing centres, distribution centres and warehousing facilities, as well as for additional classrooms to avoid triple-shifting of classes and the replacement and renovation of toilet units in existing schools. In 1986 this requirement was $7.6 million, but only $1.5 million of the proposed projects have been funded as at the date of this report. Accordingly a number of the proposed projects are included in the 1987 budget estimate, which has been increased marginally over the 1986 level. If sufficient funds are not found to enable the Agency to build these much-needed facilities, buildings will have to continue to be rented, which will increase the overall operating costs of the Agency.

E.  Programmes

14. In 1987 the education programme will account for about 58 per cent of the total General Fund budget. Health services represent 14.0 per cent of the budget, relief services equal 11 per cent, operational services 4.8 per cent and common services 12.2 per cent. Each of these programmes is described below.

1.  Education

15. The Agency's education programme includes elementary and preparatory schooling, vocational and professional training in Agency-operated vocational training centres, and a scholarship grants programme to help in the financing of refugee students seeking higher education in or near the Agency’s areas of operation. The general education programme for elementary and preparatory age group students provides schooling for 352,800 pupils enrolled in 638 Agency schools serviced by a teaching staff of 10,200. In addition 8,540 refugee pupils are enrolled in government and private schools. It is projected that the number of pupils serviced by the Agency will increase by 2,840 in the 1987/88 school year, requiring the hiring of about 78 additional teachers in the autumn of 1987.

16. In UNRWA's 8 training centres, 3,660 training places are available to Palestine refugees for vocational and technical training and 850 for teacher training. The type and content of the courses are continually revised by the Agency to enable graduates from the centres to obtain employment so as to be able to contribute economically to the continuing development of the region. During the 1985/86 academic year, UNRWA awarded 360 scholarships for refugees to study at universities.

17. In planning the general education programme for the 1987/88 school year, the Agency has concentrated on lowering the occupancy level of the most congested classrooms so that no class section will have more than 50 pupils. This will require the employment of a further 67 teachers in addition to those required to accommodate normal growth in the school population (see para. 14). An additional 66 teaching staff will be employed in Gaza to eliminate the work-load difference that currently exists between Gaza and the West Bank. The aim of these policies to overcome the effects of the freeze in the number of teaching positions in the 1985/86 school year made necessary by the severe financial constraints that faced the Agency in 1985.

18. The goal of the Agency’s construction programme for education is to provide standard schools to replace rented schools and unsatisfactory or unsuitable Agency schools as well as to provide for the growth in school population. The Agency is able to recover the cost of new standard schools in full in six years through reductions in the number of teachers required. The programme to provide improved sanitation facilities in-current Agency schools that was started in 1986'is being continued in 1987.

19. Expenditure for the education programme is estimated at $102.7 million for 1987, as compared to $100.8 million in 1986.

2.  Health

20. Primary health care is provided through curative and preventive medical care services and maternal and child health programmes. These programmes are operated through a network of 98 health centres/health points, polyclinics, hospitals, laboratories and rehabilitation centres, run either by UNRWA or Governments which provide services to about 1,878 million eligible Palestine refugees.

21. Basic community sanitation services are provided by UNRWA in 61 camp locations housing Palestine refugees and displaced persons. These services cover the provision of potable water, sanitary disposal of solid and liquid wastes, drainage of storm water and the control of disease-carving insects and rodents.

22. Three general policy objectives have been incorporated in the 1987 budget estimates. They are to improve specialist medical services by employing a limited number of additional doctors and nurses, to expand clinical laboratory services to areas where they do not currently exist, and to improve dental health services. In the occupied territories, the thrust of the policy decisions is to make available additional hospital beds to refugees in Gaza and to improve sanitary conditions through major capital equipment programmes for garbage collection and for the reconstruction of sewer systems.

23. Estimated costs for the health programme have not increased, although there is a planned expansion in certain areas of operation. Maintaining the budget at the 1986 level of about $25.3 million has been made possible by exchange rate changes in several currencies in the areas of operation.

24. The major goal of the Agency’s relief programme is to assist destitute refugee families through a Special Hardship Case programme which provides basic food needs, blankets, clothing for children, and shelter repair and reconstruction services. Currently this programme services 118,000 beneficiaries. Limited cash grants are given to Special Hardship Cases and adult training programmes are also carried out. Because of increased economic difficulties in the Agency’s areas of operation, the number of Special Hardship Case applications is expected to increase in 1987 by 11,200. Food and clothing are distributed to the eligible refugees through a network of distribution centres and distribution points located throughout the camps, with food distribution being made either monthly or bimonthly, while clothing is distributed twice annually.  With the expansion in the number of beneficiaries in 1987, cash costs will increase.

25. Further development of sewing and women’s activity centres are planned in 1987 with the objective of giving participants skills that can be used to augment their family income. Additional funding will be required to construct and equip planned new centres and to employ trained teaching staff.

26. The 1987 budget estimate for this programme is $19.7 million, which is an increase of about $2.6 million over 1986, brought about principally by the anticipated increase in Special Hardship Cases.

4.  Operational services

27. The three substantive programmes of the Agency are supported by a supply and transport operation and an architectural and civil engineering services group. The supply and transport operation provides procurement, freight transport and passenger transport services in all the areas of operation. In 1986, 23,650 tons of basic commodities and 5,000 tons of general cargo were handled through a network of central and satellite warehouses for final distribution to the beneficiaries of the services provided by the Agency's programmes. The logistics operations of the Agency are carried out by a fleet of vehicles that are used to transport commodities and general stores, for garbage collection, water distribution and sewage clearance services, and for education and health programmes. In total the Agency has a fleet of 462 vehicles. All of these vehicles are maintained by the Agency’s vehicle maintenance staff. The proposed budget for this operation in 1987 is $7.5 million, compared to $7.2 million in 1986.

28. The architectural and civil engineering group is responsible for the design of all new Agency facilities and for the maintenance of existing Agency premises. In 1986 the staff have worked on the design of buildings to the value of $6.6 million, supervised construction worth about $2.8 million and implemented a maintenance programme of about $1.4 million. The budget estimate for architectural and civil engineering services in 1987 is $1.3 million, an increase of $200,000 over 1986. The costs associated with the construction of new facilities is, in most cases, recovered as a direct charge to the Construction Fund.

5.  Common services

29. Common services support all programmes run by the Agency and cover two distinct areas: general management and administrative services. General management consists of the offices of the Commissioner-General and Deputy Commissioner-General the directors in each field, and the functions of legal services, external relations, public information, internal audit and management services. Administrative services include financial, personnel, data processing and related functions.

30. The increase in common service costs is due to two major factors. Firstly, although there have been reductions in programme costs due to more favorable exchange rates in two of the areas of UNRWA operations, there have been increases in costs resulting from less favorable exchange rates in the locations where the majority of the Agency's administrative personnel are stationed (Vienna and Amman). Secondly, the proposed budget for administrative services includes the costs associated with the move of the Agency's headquarters unit in Amman from rented space to space recently made available in Agency- owned premises, saving rent. The one-time cost of approximately $600,000 in 1987 will be recovered through rental savings over the next five years.

F.  Staff costs

31. Staff costs make up a large part of UNRWA's operating budget, as is illustrated in table, 2, and are carefully controlled and monitored throughout the operating year. In preparing the 1987 budget, administrative staff have been held to the 1986 level while staff in the substantive programmes have been increased to a limited extent to provide for the growth in the refugee population and eliminate work-load anomalies. Table 2 shows the estimated expenditure for staff funded by the regular budget and by extra-budgetary funds, while table 3 contains the staffing table of the Agency, also subdivided by source of funding (regular budget and extra-budgetary funds), and shows the total number of staff employed. Efforts are continually being made to improve the productivity of staff by providing additional training and through the introduction of automated equipment. As posts become vacant, their functions are carefully analyzed to ensure that they are still required before action is taken to fill them.

32. In 1987, 270 additional staff will be required in the education, health and relief programmes. Also a small number of reclassifications are included in the budget estimates to allow for the correction of some post classifications and the redistribution of duties and responsibilities where this will result in improved efficiency and effectiveness.

33. Estimated staff costs in 1987 are $137 million compared to $134.9 million in 1986.

Table 2. Summary of the 1987 regular and extra-budgetary cost estimates

classified by expenditure groups

(Thousands of United States dollars)

1986

appropriations

1987

estimates

Classification of types of expenditure

  I.

 II.

III.

 IV.

Regular budget

Established posts

  International

Extrabudgetary staff costs

Established posts

  International

  Locally recruited

Extrabudgetary other costs

Contract services

Operational expenses

Supplies

Building and equipment

Premises

Grants and subsidies

Reimbursements and transfers

  from production units

Subtotal

Supplies and services in kind

Grand total

  5 510

    750

128 734

  5 806

    615

 10 262

 10 897

  4 816

  6 721

 (1 078)

173 033

 18 180

191 213

=======

  6 176

    578

130 285

  6 103

    944

 10 877

 12 900

  4 566

  7 322

 (1 094)

178 657

 21 687

200 344

=======

Table 3. Staffing table

Established

posts

Regular budget

Established

posts

Extrabudgetary

Posts

provided by

UNESCO and WHO

Grand total

1986

1987

1986

1987

    1986

   1987

1986

1987

Professional

  and above

USG

ASG

D-2

D-1

P-5

P-4

P-3

P-2/1

 1

 1

 1

10

16

36

15

 2

 1

 1

 1

10

16

36

15

 2

     –

     –

     –

     –

     3

     2

     –

     1

     –

     –

     –

     –

     3

     2

     –

     1

     –

     –

     2

     –

     5

    19

     1

     –

     –

     –

     2

     –

     5

    19

     –

     –

     1

     1

     3

    10

    24

    57

    16

     3

     1

     1

     3

    10

    24

    57

    15

     3

Subtotal

82

82

     6

     6

    27

    26

     115

     114

General Service

Other

 services

10

10

     1

     1

          –

       1

      11

      11

Subtotal

10

10

     1

     1

          –

       1

      11

      11

Area staff

G-18

17

16

15

14

13

12

11

10

 9

 8

 7

 6

 5

 4

 3

 2

 1

__

__

    16

     9

    75

    87

   172

    69

   284

   236

 2 229

 2 087

 4 430

 1 859

   948

   798

   377

   203

   444

 2 969

    17

     9

    86

    83

   184

    75

   251

   219

 2 526

 2 247

 4 313

 1 746

 1 065

   842

   352

   199

   479

 2 865

          

        

    16

     9

    75

    87

   172

    69

   284

   236

 2 229

 2 087

 4 430

 1 859

   948

   798

   377

   203

   444

 2 969

    17

     9

    86

    83

   184

    75

   251

   219

 2 526

 2 247

 4 313

 1 746

 1 065

   842

   352

   199

   479

 2 865

Subtotal

 –

 –

17 292

17 558

         –

       –

17 292

 17 558

Grand total

92

==

92

==

17 299

======

17 565

======

        27

        ==

  

      26

      ==

17 418

======

 17 683

 ======

G.  Non-staff costs

34. Expenditures in 1987 will increase for the maintenance of buildings and facilities, supplies, replacement of unserviceable equipment and for subsidized hospital services in Gaza and other fields.  Estimated expenditure in 1987 for goods and services is $41.6 million compared to $38 million in 1986.

V.  FINANCING THE 1987 BUDGET

35. The cash and in-kind income that will be required to finance the 1987 UNRWA budget is shown in the following table:

1987

(Millions of United States dollars)

Cash

In kind

Total

A.

B.

C.

General Fund

Project Fund

Capital Construction Fund

Total

163.0

  7.4

  8.3

178.7

15.4

 6.2

  –

21.6

178.4

 13.6

  8.3

200.3

36. UNWRA has no reserves on which to draw to finance the 1987 budget. Funds for the operations of the Agency's programmes will be totally dependent, therefore, on the contributions received from donors. Contributions to UNRWA are made in two forms: cash and in-kind donations of basic commodities (principally food) and services.

A.  Cash requirements

37. To continue to provide basic education, health and relief services to refugees, UNRWA will require $163 million to finance its General Fund. This compares with estimated income for 1986 of $154.6 million. In addition to the cash resources required for General Fund operations, UNRWA has unmet Capital Construction Fund deeds in 1987 of $8.3 million. Donors will be sought for these projects. Continuing support of about $7.14 million is anticipated from current donors for the funding of the remaining ongoing projects.

B.  In-kind requirements

38. In-kind requirements for 1987 are estimated to be $21.7 million. Several donors have customarily made in-kind contributions of basic commodities and services to UNRWA. It is expected that they will be in a position to continue their support in 1987. In 1984 and 1985, the quantities of food products donated to the Agency had fallen off. Last year the Agency issued a special appeal for flour in order to rebuild stock reserves for emergency purposes, such as in Lebanon, and received a positive response from a number of Governments. This flour has been delivered and reasonable stock balances are now held by the Agency.

Notes

1/ Official Records of the General Assembly, Forty-first Session, Supplement No. 13 (A/41/13).

2/ Ibid., Fortieth Session, Supplement No. 13 (A/40/13/Add.1), para. 9.


ANNEX I

Contributions pledged to 30 September 1986

(United States dollars)

Contributor

Cash

In kind

Total

I.  Contributions from Governments

Argentina

Australia

Austria

Bahrain

Belgium

Burma

Cameroon

Canada

Chile

China

Cyprus

Denmark

Egypt

Finland

France

Germany, Federal Republic of

Greece

Holy See

Iceland

India

Indonesia

Iran (Islamic Republic of)

Ireland

Israel

Italy

Japan

Jordan

Kuwait

Lebanon

Luxembourg

Malaysia

Maldives

Mexico

Monaco

Netherlands

Norway

Oman

Pakistan

Philippines

Portugal

Qatar

San Marino

Saudi Arabia

Senegal

Seychelles

Spain

Sri Lanka

Sweden

Switzerland

Syrian Arab Republic

Thailand

Tunisia

Turkey

United Kingdom of Great Britain

  and Northern Ireland

United States of America

Venezuela

Yugoslavia

Zimbabwe

       15 000

      977 620

      145 000

       15 000

      428 304

        1 000

        6 000

    6 127 247

        5 000

       50 000

        1 983

    2 463 394

        7 407

      958 252

    1 043 952

    4 368 666

       60 000

       14 500

        9 500

       17 000

        8 000

       30 000

      448 470

         –

    4 874 431

    9 500 000

         –

    1 100 000

         –

        7 851

        5 000

        1 000

        3 000

        1 708

    2 028 875

    8 580 905

       25 000

       21 065

        2 000

       15 000

      100 000

        3 170

    1 000 000

        5 000

          300

    1 382 271

         –

    9 516 668

    1 534 558

         –

       13 532

       11 000

       30 000

    7 147 754

   67 000 000

       10 000

         –

        3 689

      346 154

      741 714

      353 320

        7 642

      289 300

      847 000

    2 444 706

      544 236

       12 497

        2 000

    3 453 327

      132 102

       25 000

       15 000

    1 323 774

      145 000

       15 000

      428 304

        1 000

        6 000

    6 127 247

        5 000

       50 000

        1 983

    2 463 394

        7 407

      958 252

    1 785 666

    4 721 986

       60 000

       14 500

        9 500

       24 642

        8 000

       30 000

      448 470

      289 300

    5 721 431

   11 944 706

      544 236

    1 100 000

       12 497

        7 851

        5 000

        1 000

        3 000

        1 708

    2 028 875

    8 580 905

       25 000

       21 065

        2 000

       15 000

      100 000

        3 170

    1 000 000

        5 000

          300

    1 382 271

        2 000

    9 516 668

    4 987 885

      132 102

       13 532

       11 000

       30 000

    7 147 754

   67 000 000

       10 000

       25 000

        3 689

Subtotal

  131 125 072

    9 198 998

  140 324 070

II.

Contributions from intergovernmental

organizations

European Community

OPEC Fund

AGFUND

   20 138 000

      726 000

      920 000

   11 584 263

         –

         –

   31 722 263

      726 000

      920 000

Subtotal

   21 784 000

   11 584 263

   33 368 263

III.

Contributions from United Nations

and United Nations agencies

United Nations (from regular budget)

UNICEF

UNESCO

WHO

      533 700

      510 890

         –

         –

    1 470 020

      465 890

    5 510 890

       33 700

    1 470 020

      465 890

Subtotal

    5 544 590

    1 935 910

    7 480 500

IV.

Income from non-governmental sources

American Friends Service Committee

American Near East Refugee Aid

Arabian American Oil Company

  (ARAMCO) – Saudi Arabia

Calouste Gulbenkian

  Foundation – Portugal

Co-operation for Development

Gaza Authorities

Holy Land Christian Mission

Indonesian National Committee for

  the Commemoration of the Fortieth

  Anniversary of the United Nations

Near East Council of Churches

Norwegian People's Aid

Norwegian Refugee Council

OXFAM – UK

Pontifical Mission for Palestine

Statens Serum Institute

SURVIVE MIVA – UK

Swedish Save the Children Fund

 (Radda Barnen)

Sundry contributors

      131 000

        2 000

      220 000

       12 258

       58 623

         –

      120 000

        6 000

         –

          823

      118 074

       41 654

       99 714

         –

       18 837

       32 000

      816 011

       21 239

       71 618

       40,000

        3,451

       65 847

      131 000

       23 239

      220 000

       12 258

       58 623

       71 618

      120 000

        6 000

       40 000

          823

      118 074

       41 654

       99 714

        3 451

       18 837

       32 000

      881 858

Subtotal

    1 676 994

      202 155

    1 879 149

V.

Income from others

Capen, Ms. Anna

Turkish Cypriot People

Sundry contributors

        8 000

        2 000

      207 110

        7 657

        8 000

        2 000

      214 767

Subtotal

      217 110

        7 657

      224 767

Total

  160 347 766

  ===========

   22 928 983

   ==========

  183 276 749

  ===========

ANNEX II

Direct government assistance to Palestine refugees a/

(1 July 1985-30 June 1986)

Note. All data in the table below are shown as reported by the Governments concerned and are expressed in United States dollars computed by applying United Nations operational rates of exchange.

Egypt

Israel

Jordan

Lebanon b/

Syrian Arab

Republic

Education services

Social welfare

 services

Medical services

Housing

Security services

Miscellaneous services

Administrative costs

     Total

  82 224 000

   3 925 000

      c/

      d/

      –

      d/

 184 111 000

 270 260 000

 ===========

  12 460 000

   1 680 000

   7 500 000

   1 500 000

       –

   4 000 000

       –    

  27 140 000

  ==========

  74 780 495

   3 610 871

  22 944 076

  19 075 286

      e/

      e/

   5 319 587

 125 730 315

 ===========

  __________

  ==========

  56 177 496

   2 721 686

   2 185 810

   8 271 464

   6 148 472

   9 181 471

   6 345 900

  91 032 299

  ==========

____________________________________________________________________________________

a/ This assistance was rendered direct to the refugees, in addition to contributions to UNRWA (see annex 1).

b/ Figures not received.

c/ Health services are included in social welfare services.

d/ Housing and miscellaneous services are included in administrative costs.

e/ Security and miscellaneous services are included in administrative costs.

ANNEX III

Ongoing Projects that are fully funded by donors for 1987

Title

Thousands of United States

dollars

1.

2.

3.

4.

5.

6.

7.

8.

9.

Supplementary feeding programme, funded by EEC

Income-generating project in Gaza, funded by Co-operation for Development, United Kingdom

Gaza Centre for the Blind, funded by the

Pontifical Mission and other donors

Husn Camp Centre for the Disabled, funded by the Mennonite Central Committee

Ramallah Men's and Women's Training Centre,

funded by the Government of Denmark

ARAMCO-University scholarships, funded by ARAMCO

Jarash community project for the disabled,

funded by OXFAM

Suf community project for the disabled,

funded by OXFAM

Income-generating project in Lebanon,

funded by Norwegian People's Aid

10 194

    24

   213

    15

 3 040

    68

    24

    15

    40

—–


2019-03-11T22:24:21-04:00

Share This Page, Choose Your Platform!

Go to Top