The present report contains the proposed budget for the 12-month period from 1 July 2000 to 30 June 2001 for the maintenance of the United Nations Disengagement Observer Force (UNDOF), which amounts to $34,946,700 gross ($34,195,300 net).

Of the total budget, some 54 per cent of resources relate to military personnel costs. Civilian personnel costs account for 15 per cent of the budget, operational costs reflect 29 per cent of the budget, while staff assessment comprises 2 per cent of the total.

The actions to be taken by the General Assembly are set out in paragraph 3 of the present report.

Contents

Para-

graphs

Page

I.  Overview

1-3

3

II. Political mandate of the mission

4-5

4

III. Operational plan and requirements

6-17

4

IV. Contributions made under the status-of-forces agreement

18

6

V. Voluntary contributions and trust funds

6

A. Voluntary contributions

6

B. Trust funds

6

VI. Status of reimbursement of troop-contributing Governments

19-20

6

A. Current troop-contributors

19

6

B. Status of reimbursement

20

6

VII. Contingent-owned equipment and self-sustainment

 21-25

7

A. Method of reimbursement

21

7

B. Requirements

22-25

7

VIII. Staffing requirements

26-29

7

A. Changes in staffing requirements

26-29

7

B. Current and proposed staffing

9

IX. Other issues

30-34

11

Annexes

I. Cost estimates for the period from 1 July 2000 to 30 June 2001

12

A. Summary statement

12

B. Distribution of gross requirements by major cost component

14

C. Supplementary information

15

II. Cost estimates for the period from 1 July 2000 to 30 June 2001: analysis

18

A. Standard and mission-specific costs

18

B. Distribution of resources by budgetary cost parameters: standard and mission-specific costs

22

C. Non-recurrent requirements

23

III. Implementation of previous recommendations of the Advisory Committee on Administrative and Budgetary Questions

30

IV. Organization chart

31

Map

32

I. Overview

1. The present report contains the proposed budget for the 12-month period from 1 July 2000 to 30 June 2001 for the maintenance of the United Nations Disengagement Observer Force (UNDOF), which amounts to $34,946,700 gross ($34,195,300 net).

2. Estimated requirements for the period from 1 July 2000 to 30 June 2001 represent a 5.1 per cent increase ($1,699,200) in total resources (gross) in relation to the apportionment for the current period from 1 July 1999 to 30 June 2000. The proposed increase reflects a 3 per cent increase in civilian personnel costs, a 17.4 per cent increase in operational costs, a 2.5 per cent increase in staff assessment costs and the first-time provision made for the training programme. This increase is partially offset by a 0.2 per cent decrease in military personnel costs.

Table 1
Financial resources
(Thousands of United States dollars)

Category of expenditure

1998/99 expenditures

1999/00

apportionment

2000/01

cost estimatesa

Proposed increase/(decrease) over 1999/00

Amount

Percentage

Military personnel

18 357.1

18 781.5

18 746.3

(35.2)

(0.2)

Civilian personnel

4 952.2

5 010.3

5 158.0

147.7

3.0

Operational costs

7 584.2

8 722.8

10 240.6

1 517.8

17.4

Other programmes

50.4

50.4

Staff assessment

731.4

732.9

751.4

18.5

2.5

Gross requirementsb

31 624.9

33 247.5

34 946.7

1 699.2

5.1

Voluntary contributions

Total

31 624.9

33 247.5

34 946.7

1 699.2

5.1

a Information on the distribution of resources by standard and mission-specific costs is contained in annex II.B.

b Exclusive of provision for the support account for peacekeeping operations and the United Nations Logistics Base at Brindisi.

Table 2
Human resources

Military and civilian staff resources

1998/99a

1999/00a

2000/01

Increase/(decrease) over 1999/00

Military observers

Military contingents

1 037

1 037

1 037

Military liaison officers

Civilian police

International staff

36

36

38

2

National professional staff

Local staff

84

87

87

United Nations Volunteers

a Represents highest level of authorized strength.

3. The actions to be taken by the General Assembly are as follows:

(a) To appropriate the amount of $34,946,700 gross ($34,195,300 net) for the maintenance of the mission for the 12-month period from 1 July 2000 to 30 June 2001;

(b) To assess the amount in subparagraph (a) above at a monthly rate of $2,912,225 gross ($2,849,608.33 net), should the Security Council decide to continue the mandate of the mission;

(c) Pursuant to the provisions of paragraph 13 of General Assembly resolution 53/226 of 8 June 1999, to credit back to Member States an amount of $4,022,162 during the fifty-fourth session of the General Assembly, representing part of the remaining net surplus balance held in the suspense account for UNDOF.

II. Political mandate of the mission

(Security Council resolution 350 (1974) of 31 May 1974)

4. The Protocol to the Agreement on Disengagement, which was concluded between Israeli and Syrian Forces (S/11302/Add.1, annexes I and II), requires UNDOF to use its best efforts to maintain the ceasefire, to see that it is scrupulously observed and to supervise the Agreement and the Protocol thereto with regard to the areas of separation and limitation.

5. The current mandate expires on 31 May 2000, in accordance with Security Council resolution 1276 (1999) of 24 November 1999.

III. Operational plan and requirements

6. In order to carry out its mandate, UNDOF maintains an area of separation, which is some 80 kilometres long and varies in width between approximately 10 kilometres in the centre to less than one kilometre in the extreme south. The terrain is hilly and is dominated in the north by Mount Hermon, which necessitates the use of special vehicles designed for these types of road and terrain conditions. The highest United Nations position is at an altitude of 2,800 metres. The area of separation is inhabited and is policed by the Syrian authorities. No military forces other than UNDOF are permitted within it.

7. UNDOF is entirely deployed within and close to the area of separation, with two base camps, 44 permanently manned positions and 11 observation posts. The headquarters of UNDOF is located at Camp Faouar and an office is maintained at Damascus. In addition, the Force operates patrols by day and night. The Austrian battalion, which includes a Slovak company, is deployed in the northern part of the area of separation, while the Polish battalion is deployed in the southern part. Its base camp is Camp Ziouani. Mine clearance is conducted by both battalions under the operational control of UNDOF headquarters.

8. The Canadian and Japanese logistic units, which are based in Camp Ziouani, with a detachment in Camp Faouar, perform the second-line general transport tasks, rotation transport, control and management of goods received by the Force and maintenance of heavy equipment.

9. First-line logistic support is internal to the contingents and includes transport of supplies to the positions. Second-line logistic support is provided by the Canadian and Japanese Governments and third-line support is provided through normal supply channels by the United Nations. Damascus International Airport serves as the main airbase of UNDOF, along with Tel Aviv International Airport. The seaports of Lattakia and Haifa are used for sea shipments. Most requirements of the Force are procured locally in the mission area.

10. From its various positions and through its patrols, the Force supervises the area of separation and intervenes whenever any military personnel enter or try to operate therein. This is effected by means of permanently manned positions and observation posts, by foot and mobile patrols operating at irregular intervals by day and night on predetermined routes.

11. On each side of the area of separation there is one area of limitation with three zones, one 0 to 10 kilometres, one 10 to 20 kilometres and one 20 to 25 kilometres wide. UNDOF inspects these areas every two weeks in order to ascertain that the agreed limitations in armaments and forces are being observed.

12. With an authorized military strength of 1,037 all ranks and a current civilian component of 123 staff, UNDOF is spread over the length and breadth of its area of operation. Both parties cooperate fully with the Force, and for a number of years there have been no serious incidents.

13. The harsh terrain over which the Force operates results in less than normal lifespans for vehicles and other related equipment. One of the continuing priorities of UNDOF is to ensure proper replacement of vehicles, as this is critical to enabling the Force to perform its mandate. It is also essential that adequate stocks of spare parts are kept for the maintenance and repair of the vehicles so that they are all operational.

14. Over the years, approximately 600 buildings of various types used by the Force have deteriorated and require repair and upgrading or replacement. As previously, provision has been made in the proposed budget for the period commencing 1 July 2000 for continuation of this programme.

15. The continued upgrading and strengthening of the electronic data-processing (EDP) network and capability is another priority for the Force. However, to make maximum use of and to derive maximum benefit from wider use of such technology, is necessary to provide additional staffing for installation and maintenance of the equipment and system.

16. Similarly, it is also essential to continue the upgrading of communications equipment and microwave links to ensure adequate and effective communications in the Force.

17. A new priority for the mission is to address the environmental consequences of the Force's activities and presence in the area of operations. The Force is taking steps to ensure that its presence does not contribute to further environmental pollution of the area. For this reason, first-time proposals have been included for the purchase of equipment for proper treatment of human waste and disposal of UNDOF garbage.

IV. Contributions made under the status-of-forces agreement

18. No status-of-forces agreement is in force. However, by a note verbale of 22 February 1976, the Government of the Syrian Arab Republic informed the United Nations that UNDOF would be treated in accordance with the 1946 Convention on the Privileges and Immunities of the United Nations.

V. Voluntary contributions and trust funds

A. Voluntary contributions

(United States dollars)

Government/organization

Contribution

Value

Switzerland

Air ambulance servicea

b

a This service was not utilized during the period from 1 January to 31 December 1999.

b The value of this contribution has not yet been determined.

B. Trust funds

(United States dollars)

Receipts

Expenditures

Pledged

Trust fund for support activities of UNDOF

Cash contributions

1 February 1998 to 31 January 1999

240 894

213 337

B

1 February 1999 to 31 January 2000

211 611

B

B

Total

452 505

213 337

B

VI. Status of reimbursement of troop-contributing Governments

A. Current troop-contributors

19. The current troop contributors are the Governments of Austria, Canada, Japan, Poland and Slovakia. In the past, troops were also provided to the Force by Finland, the Islamic Republic of Iran and Peru.

B. Status of reimbursement

20. Full reimbursement in accordance with the standard rates established by the General Assembly for troop costs has been made to these States through 30 April 1999. An amount of $9,071,716 is due for troop costs for the period ending 31 December 1999.

VII. Contingent-owned equipment and self-sustainment

A. Method of reimbursement

21. Except for the Government of Japan, no contingent-owned equipment agreements have been signed with any of the troop-contributing Governments of UNDOF. However, for budgeting purposes, wet-lease rates have been applied for two troop-contributing Governments for reimbursement of the contingent-owned equipment for UNDOF.

B. Requirements

1. Major equipment

22. The requirement for reimbursement of major equipment (seven vehicles) to one contingent amounts to $118,944.

2. Special equipment

23. The requirement for the maintenance of special equipment (X-ray machine) to one contingent amounts to $11,770.

3. Self-sustainment

24. No provision for self-sustainment is included in the cost estimates for the budgetary period.

4. Mission factors

25. No mission factors have been applied to UNDOF.

VIII. Staffing requirements

A. Changes in staffing requirements

Number of posts

Current staffing

Proposed staffing requirements

Net change

International staff

Under-Secretary-General

Assistant Secretary-General

1

1

D-2

D-1

P-5

1

1

P-4

1

1

P-3

2

3

1

P-2/P-1

Subtotal

5

6

1

General Service (Principal level)

General Service (Other level)

5

6

1

Subtotal

5

6

1

Field Service

26

26

Security Service

Subtotal

26

26

Total, international staff

36

38

2

Local staff

87

87

National Professional staff

United Nations Volunteers

Subtotal

87

87

Total

123

125

2

26. For the next period from 1 July 2000 to 30 June 2001, it is proposed that the civilian staffing establishment for UNDOF be increased by two posts, from 123 to 125 posts. The two new posts requested are for:

(a) One P-3 level Budget Officer post in Administrative Services;

(b) One General Service post in the Electronic Data Processing Section.

27. Currently, UNDOF does not have a dedicated Budget Officer post, and the budgetary functions are being covered by the Chief Finance Officer, who is therefore personally responsible for both financial and accounting matters as well as budget preparation and implementation. The workload burden on the Chief Finance Officer has become onerous. Hence, the request for a new Budget Officer post, which is expected to help the Force administration to improve its budgetary work.

28. One new General Service post for an EDP system administrator is required to ensure smooth functioning, coordination and support of the Force's EDP systems and software, in particular, the Reality Procurement System and the Sun Accounting System.

29. Following a review of the situation of posts and for operational reasons, it has been concluded that a conversion of General Service staff posts into local staff posts is not possible at this time.

B. Current and proposed staffing

Professional category and above

Total

Field Ser-

vice

General Service and related categories

Secu-

rity Service

Total

Lo-

cal staff

Professional staff

United Nations Volunteers

Grand total

USG

ASG

D-2

D-1

P-5

P-4

P-3

P-2/ P-1

Principal level

Other level

Substantive Office of Force Commander

Current

1

1

1

1

2

Proposed

1

1

1

1

2

Total, Substantive Office

Current

1

1

1

2

Proposed

1

1

1

1

2

Administrative Services

Current

1

1

1

1

2

Proposed

1

1

2

1

1

3

Finance Section

Current

1

1

2

1

1

8

11

Proposed

1

1

2

1

8

11

Personnel and Travel

Current

1

1

1

1

5

7

Proposed

1

1

1

1

5

B

7

Procurement

Current

4

4

11

15

Proposed

4

4

11

15

General Service

Current

5

1

6

24

30

Proposed

5

1

6

24

30

Communications

Current

11

11

10

21

Proposed

11

11

10

21

Transport

Current

4

4

25

29

Proposed

4

4

25

29

Electronic Data Processing

Current

2

2

3

5

Proposed

2

1

3

4

7

Force Construction Engineer

Current

1

1

Proposed

1

1

Total, Administrative Services

Current

1

1

2

4

26

4

30

87

121

Proposed

1

1

3

5

26

5

31

87

123

Total

Current

1

1

1

2

5

26

5

31

87

123

Proposed

1

1

1

3

6

26

6

32

87

125

IX. Other issues

30. In paragraph 13 of its resolution 53/226, the General Assembly, based on the recommendation of the Advisory Committee on Administrative and Budgetary Questions (A/53/895/Add.1, para. 14), requested the Secretary-General to credit back to Member States in a phased manner not to exceed three years, the net surplus balance of $13,622,162 held in the suspense account for the Force. During the fifty-third session of the General Assembly, in accordance with paragraphs 9 and 12 of the same resolution, an amount of $5.6 million was credited back to Member States.

31. Taking into account the current cash position of UNDOF, the anticipated assessed contributions to be received and the mission's projected monthly cash requirements for the period, the Secretary-General, proposes to credit back to Member States during the fifty-fourth session of the General Assembly an amount of $4,022,162, representing part of the remaining balance held in the suspense account for UNDOF. The remaining balance of $4,000,000 should be credited back to Member States during the fifty-fifth session in 2001, subject to the cash position of the Force at that time.

32. In paragraph 7 of resolution 53/226, the General Assembly also requested the Secretary-General to expedite the process of improving the working conditions of the local staff in the Force, taking into account the difficulties arising from the relocation of Force headquarters from Damascus to Camp Faouar, and to report thereon to the Assembly at its fifty-fourth session.

33. The following measures have been taken by the UNDOF administration in response to the request of the General Assembly:

(a) Reduced-price menu for local staff: UNDOF has introduced a reduced-price menu of 75 Syrian pounds (equivalent to US$ 1.63) for sandwiches and the salad bar, compared with the standard meal option, which is priced at 130 Syrian pounds (equivalent to US$ 2.83)

(b) Provision of a separate break facility for all UNDOF staff, including local staff: an appropriate building has been identified and necessary renovations are being carried out on this building;

(c) Currently only some offices are air-conditioned. Action is being taken to air-condition offices for all staff, including local staff;

(d) Access to e-mail: UNDOF is in the process of installing Lotus Notes for general use. When installation is completed, all staff members, including local staff, will have internal e-mail access.

34. In summary, the UNDOF administration has been conducting a continuing dialogue with the staff representatives on matters related to the improvement of working conditions for civilian personnel, including local staff. That has resulted in a number of issues being addressed. This dialogue will continue with a view to addressing other issues of common concern.

Annex I

Cost estimates for the period from 1 July 2000 to 30 June 2001

A. Summary statement

(Thousands of United States dollars)

(1)

1 July 1998

to 30 June 1999

(2)

1 July 1999

to 30 June 2000

(3)                          (4)

1 July 2000 to 30 June 2001

Category of apportionment

Expendituresa

Apportionmentbc

Total estimates

Non-recurrent

estimates

I.

Military personnel

1. Military observers

2. Military contingents

17 930.6

18 350.8

18 315.6

3. Other costs pertaining to military personnel

(a) Contingent-owned equipment

126.5

130.7

130.7

(b) Self-sustainment

(c) Death and disability compensation

300.0

300.0

300.0

Subtotal, line 3

426.5

430.7

430.7

Total, category I

18 357.1

18 781.5

18 746.3

II.

Civilian personnel

1. Civilian police

2. International and local staff

4 952.2

5 010.3

5 158.0

3. United Nations Volunteers

4. Government-provided personnel

5. Civilian electoral observers

Total, category II

4 952.2

5 010.3

5 158.0

III.

Operational costs

1. Premises/accommodation

1 300.5

1 492.9

1 523.7

524.5

2. Infrastructure repairs

3. Transport operations

3 159.7

4 025.7

5 820.6

4 048.3

4. Air operations

5. Naval operations

6. Communications

731.7

625.3

481.7

205.0

7. Other equipment

968.8

1 103.0

866.2

616.2

8. Supplies and services

1 235.1

1 315.9

1 367.4

9. Air and surface freight

(a) Transport of contingent-owned equipment

(b) Commercial freight and cartage

188.4

160.0

181.0

Subtotal, line 9

188.4

160.0

181.0

Total, category III

7 584.2

8 722.8

10 240.6

5 394.0

IV.

Other programmes

1. Election-related supplies and services

2. Public information programmes

3. Training programmes

50.4

4. Mine-clearing programmes

5. Assistance for disarmament and demobilization

Total, category IV

50.4

V.

United Nations Logistics Base at Brindisi

VI.

Support account for peacekeeping operations

VII.

Staff assessment

731.4

732.9

751.4

Gross requirements, categories I-VII

31 624.9

33 247.5

34 946.7

5 394.0

VIII.

Income from staff assessment

(731.4)

(732.9)

(751.4)

Net requirements, categories I-VIII

30 893.5

32 514.6

34 195.3

5 394.0

IX.

Voluntary contributions in kind (budgeted)

X.

Voluntary contributions in kind (non-budgeted)

Total

31 624.9

33 247.5

34 946.7

5 394.0

a As contained in annex I of the performance report (A/54/707). Excludes US$ 1,756,200 for the support account for peacekeeping operations and $281,400 for the United Nations Logistics Base at Brindisi.

b General Assembly resolution 53/226 of 8 June 1999.

c Exclusive of US$ 1,758,908 appropriated for the support account for peacekeeping operations and US$ 344,900 for the financing of the United Nations Logistics Base at Brindisi.

B. Distribution of gross requirements by major cost component a b
OFFSET

C. Supplementary information

Military personnel
Apportionment: $18,781,500; estimates: $18,746,300; variance: ($35,200)
1. The decrease of $35,200 under this heading is due to a reduced requirement under mission subsistence allowance owing to less need for travel by contingent personnel to pick up incoming shipments as a result of the new door-to-door delivery contract entered into.

Civilian personnel
Apportionment: $5,010,300; estimates: $5,158,000; variance: $147,700
2. The increase of $147,700 under this heading relates to international and local staff costs.

International and local staff
3. Increased salary and common staff costs requirements for international and local staff are attributable to the request for one P-3 and one General Service post (see paras. 26-29 above) and to an increase of 5 per cent in local staff salaries effective 1 March 1999, based on the results of a salary survey conducted by the United Nations Development Programme.

4. International staff salaries have been calculated on the basis of the 2000/2001 standard cost rates for New York, while local staff salaries reflect the scale currently applicable in the mission area. Based on post incumbency experience, no vacancy rate has been applied to the Force's proposed staffing establishment of 125 total posts (38 international and 87 local), including the two new posts requested in paragraph 3 above. The estimate for the 87 local staff members has been based on level 4, step 7, of the local salary scales. No vacancy factor has been applied.

5. The estimate of $44,600 under other travel costs is some 50 per cent lower than the provision of $86,800 for the current period, 1 July 1999 to 30 June 2000, and will finance headquarters and UNDOF personnel travel during the next period, as listed in annex II.A.

Operational requirements
Apportionment: $8,722,800; estimates: $10,240,600; variance: $1,517,800
6. The estimate of $10,240,600 includes non-recurrent cost requirements, which amount to $5,394,000.

7. The net increase of $1,517,800 under this heading is attributable to additional requirements totalling $1,898,200 under premises/accommodation ($30,800), transport operations ($1,794,900), supplies and services ($51,500) and air surface freight ($21,000), partially offset by a concomitant total decrease of $380,400 under communications ($143,600) and other equipment ($236,800).

Premises/accommodation
8. The increase in provision under this heading is a result of the first-time inclusion of $200,000 for the requirements related to the treatment of human waste and disposal of the Force's garbage. It provides for (a) purchase of two garbage incinerators, (b) environmental treatment of human waste, and   (c) environmental engineering textbooks/publications and training materials, as detailed in annex II.C
Transport operations
9. The budget includes a non-recurrent provision of $3,950,843 for the replacement of 39 vehicles and for purchase of 50 additional special types of vehicles and transport equipment on the basis of the operational requirements. The proposed replacement of vehicles is based on the established replacement policy for general purpose vehicles, that is, five years or 120,000 kilometres; and for heavy trucks and buses, eight years or 135,000 kilometres and 10 years or 250,000 kilometres. The detailed breakdown of the replacement and additional vehicles to be purchased is shown in annex II.C.

10. With regard to vehicle insurance, provision is made for the cost of third-party liability insurance carried by the Force to cover its fleet of motor vehicles at the rate of $490 per vehicle for coverage of 376 vehicles, and at $286 each for 13 armoured personnel carriers in accordance with the worldwide vehicle third-party liability insurance programme.
Communications

11. Requirements for replacement and acquisition of communications equipment, as detailed in annex II.C ($481,700), are lower than those requested for the current period from 1 July 1999 to 30 June 2000 ($625,300).
Other equipment

12. Similarly, requirements under this heading, as set forth in annex II.C ($866,200), are also lower than those for the current period ($1,103,000).
Supplies and services

13. The increased provision under this heading is a result of the reallocation of contractual services requirements. The cost of hiring eight local contractors ($34,000), currently budgeted under premises/accommodation, budget line item maintenance supplies, will now be shown under contractual services. Similarly, the cost of other local contractors ($40,000) hired by UNDOF, who are currently budgeted under General Temporary Assistance, will now be shown under contractual services. The consolidated estimate for contractual services also includes a new request for $20,000 for a contract to collect hazardous materials from Camps Ziouani and Faouar.
Air and surface freight

14. An upward adjustment of $21,000 for the funding requirement under this heading takes account of recent actual expenditure experience.
Training programme

15. The estimate under this heading would provide for training of UNDOF technical staff in the operation and maintenance of communications, electrical and other equipment, including EDP hardware and software such as Lotus Script, Windows 2000, the Reality procurement system and the Sun business system, as detailed in annex II.A.
Staff assessment

16. The amount budgeted under this heading represents the difference between gross and net emoluments, that is, the amount of staff assessment to which the United Nations staff members are subject, in accordance with the Staff Regulations of the United Nations. Staff assessment is estimated based on the proposed 38 international posts and 87 local-level posts.

Income from staff assessment

Apportionment: ($732,900); estimates: ($751,400); variance: ($18,500)

17. The staff assessment requirements provided for under expenditure budget line item VII have been credited to this item as income from staff assessment and will be credited to the Tax Equalization Fund established by the General Assembly in its resolution 973 A (X) of 15 December 1955. Member States are given credit in the Fund in proportion to their rates of contribution to the UNDOF budget.

Annex II

Cost estimates for the period from 1 July 2000 to 30 June 2001: analysis

A. Standard and mission-specific costs

             Proposed esti-

mates

Pre-

vious

submission

Standard

cost

Unit or

daily

cost

Monthly

cost

Annual

cost

Description

(United States dollars)

Explanation

1. Military personnel

Infantry

821

Logistic/support

216

(a) Pay and allowance

988

988

988

10% infantry, 25% logistics/support.

(b) Specialist allowance

291

291

291

2. Travel costs for military personnel

Israel

53

a

55

Syrian Arab Republic

68

a

69

Lebanon

67

a

65

Force Commander's driver

18 173

a

18 173

3. Contingent-owned equipment

130 700

130 700

4. Death and disability

300 000

400 000

300 000

5. Welfare

10.50

10.5

Leave allowance, 7 days for every 6-month period.

Welfare, other

5.40

5.40

6. Rations

6.00

9.00

6.00

Based on current contract price.

7. Civilian personnel

International staff

36

For supplementary explanation, see annex I.C.

Local staff

87

For supplementary explanation, see annex I.C.

Net salary

9 228

9 479

Level 4, step 7, at United Nations operational exchange rate, January-July 1999.

Common staff costs

3 691

3 691

Staff assessment

1 200

1 232

8. Travel costs for civilian personnel

Travel of Force Commander

6 720

6 720

CAO and other personnel to New York

16 720

1 720

Technical staff=s training and travel

22 725

Training requirement now shown under training programme.

Mission staff=s travel within mission area

14 000

19 945

Office of Internal Oversight Services

15 600

11 000

COE arrangement

5 315

Headquarters air safety officer travel to UNDOF

5 680

5 180

9. Rental of premises

Ausbatt position 27, Building No. 1

1 025

a

1 025

Ausbatt position 27, Building No. 2

300

a

300

Sewage disposal place

300

a

300

Garbage disposal place

575

a

575

Garage in Tiberias

9 000

a

9 000

Electricity for rented premise at position 27

6 700

a

6 700

10. Utilities

Electricity

431 000

a

358 000

Based on past experience and actual requirement.

Water

42 000

a

42 000

11. Vehicles

Civilian pattern

270

Military pattern

119

12. Spare parts and repair and maintenance of vehicles

Civilian pattern

1 595

6 000

1 595

Military pattern

4 571

6 000

4 537

13. Petrol, oil and lubricantsb

Diesel

Camp Ziouani

0.277

a

0.216

Based on recent expenditure experience.

Camp Faouar

0.154

a

0.146

Based on recent expenditure experience.

Filling stations

0.319

a

0.319

Based on recent expenditure experience.

Transport workshop

0.154

a

0.146

Based on recent expenditure experience.

Benzene

Camp Ziouani

0.283

a

0.223

Based on recent expenditure experience.

Camp Faouar

0.510

a

0.446

Based on recent expenditure experience.

Filling stations

0.345

a

0.354

Based on recent expenditure experience.

14. Vehicle insurance

Primary pattern

490

490

Worldwide insurance plan.

Armoured personnel carriers

286

286

Worldwide insurance plan.

15. Commercial communications

Commercial telex/telegram

10 000

a

10 000

Pouch

12 000

a

14 200

Based on actual requirement.

Satellite transponder

50 000

a

80 000

Based on actual requirement.

Official postbox rental

5 000

a

5 000

Cost of fees for access to banking data

800

a

800

Official telephone calls and line rental in mission area

15 000

a

35 500

Higher requirements resulting from additional cellular phones.

Permanent Internet connectivity

10 000

16. Miscellaneous services

Audit services

59 900

56 700

Board of Auditors.

Contractual services

For supplementary explanation, see annex I.C.

Barbering services

15 684

a

15 684

Tailoring services

29 808

a

29 808

Laundry services

59 500

a

59 500

Garbage removal

69 100

a

69 100

Kitchen helpers

24 000

a

53 400

For supplementary explanation, see annex I.C.

Medical treatment and services

77 000

a

77 000

Office hospitality

5 000

a

5 000

Miscellaneous other services

93 000

a

93 000

17. Miscellaneous supplies

Stationery and office supplies

110 000

$15/person

130 000

Based on recent expenditure experience.

Medical supplies

100 000

$28/person

112 000

Based on recent expenditure experience.

Sanitation and cleaning materials

71 000

$5/person

86 800

Based on recent expenditure experience.

Subscriptions

2 200

200

2 200

Uniform items, flags and decals

62 500

$35/person

40 000

Based on recent expenditure experience.

Field defence stores

29 900

a

29 900

Quartermaster and general stores

507 400

a

507 400

18. Training programme

Technical training courses at

(a) United Nations Logistics Base at Brindisi

20 448

Satellite/electrical distribution systems.

(b) Cyprus

5 592

Fax and photocopiers.

(c) London

10 292

Digital microwave links.

(d) Training fees and materials

14 150

Fees and materials.

19. Commercial freight and cartage

160 000

a

181 000

Based on recent expenditure experience.

a No standard cost exists for this item.

b Explanation:

Unit cost

Estimated requirement

 (Litres)

Diesel

Camp Ziouani

$0.22

374 929

Camp Faouar

$0.15

1 726 541

Filling stations

$0.14

129 600

Transport workshop

$0.15

12 000

Benzene

Camp Ziouani

$0.23

61 700

Camp Faouar

$0.45

319 875

Filling stations

$0.35

48 600

Oil and lubricants

B.  Distribution of resources by budgetary cost parameters: standard and mission-specific costs

OFFSET

C. Non-recurrent requirements

(Thousands of United States dollars, unless otherwise indicated)

(1)

(2)

(3)

(4)=(2)+(3)

(5)

(6)=(4)x(5)

Proposed units
 

Current inventory as at 30 June 1999a

Replace-

ment

Additional

Total number

of units

Unit cost

Total cost

I. Operational requirements

1. Premises and accommodation

(a) Rental of premises

(b) Alteration and renovation of premises

(c) Maintenance and supplies

(d) Maintenance services

(e) Utilities

(f) Construction/prefabricated buildings

(g) Prefabricated accommodation

73

(h) Ablution units

2

(I) Kitchen/dining facilities

4

(j) Offices

8

(k) Refrigeration units

13

(l) Storage

15

(m) Workshops

3

(n) Sea containers

57

(o) Other:

Rubb Halls (storage)

2

Multi-purpose premises

2

Each unit contains kitchen, dining and ablution units

Accommodation/office

1

Subtotal

180

(p) Construction of premises

Austrian battalionb

New heating hut, position 25, AB ($11,500); new sheltered guardhouse, Building 114, Camp Faouar ($16,000); new watchtower, position 33, AB ($15,000); new watchtower, position 16, AB ($15,000); new generator hut, Hermon Hotel, AB ($17,000); installation of dust collection system engineer workshop, Camp Faouar, AB ($7,000)

81 500.0

Polish battalionb

New accommodation, position 67, PB ($50,000); new accommodation, position 62, PB ($50,000)

100 000.0

Canadian Logisticsb

Construct fencing and roof for Hazmat Pad, Camp Ziouani ($25,000); installation of dust collection system engineer workshop, Camp Ziouani, Logbatt ($7,000)

32 000.0

Headquarters projectsb

Renovate Building B8 (Communications Control, Procurement and Transport Offices/ Observer Group Golan), Camp Faouar ($38,000); renovate Building 146, phase 2, Camp Faouar ($18,000); renovate Building B150, Camp Faouar ($21,000)

77 000.0

Environmental programmeb

Garbage incinerators

2

2

90 000.0

180 000.0

Environmental treatment of human waste

1

1

10 000.0

10 000.0

Environmental engineering textbooks/publications, CD=s/training

10 000.0

3

3

200 000.0

(q) Upgrading of roads b/

Ausbatt battalion

Improvement, repair and upgrading of roads to and in Ausbatt positions 10, 17, 37, 14, 16B, 31, 16 and 33 and patrol roads Hadar Signal Hill and 1st Coy. area

17 000.0

Polbatt area of separation

Improvement, repair and upgrading of roads to and in Polbatt positions 80, 81, 82, 85, 60, 62, 66, 67 and 68 and patrol roads Coyote, Foxtrot, Oscar and Falcon

17 000.0

Subtotal

3

3

524 500.0

Total, line 1

3

3

524 500.0

2. Infrastructure repairs

3. Transport operations

(a) Purchase of vehicles

Bus, light/panel van

43

3

3

8 872.0

26 616.0

Jeep, 4×4, SW

146

14

14

12 000.0

168 000.0

Truck, cargo, light, S/C

48

3

3

15 000.0

45 000.0

Bus, medium, 30-seater

9

6

6

33 950.0

203 700.0

Ambulance

8

Ambulance, traumab

1

1

171 200.0

171 200.0

Ambulance, E.G. Pinzgauerb

1

1

159 500.0

159 500.0

Access platform vehicleb

1

1

110 000.0

110 000.0

All-terrain vehicle (jeep, heavy)b

6

5

5

85 000.0

425 000.0

Mobile workshop, 4×4

1

1

1

50 000.0

50 000.0

Over-snow vehicle, with attachmenta

3

1

1

180 000.0

180 000.0

Backhoe loader

1

1

70 000.0

70 000.0

Heavy truck, 6×6 VTLb

6

6

7

13

130 000.0

1 690 000.0

Flat rack for VTLb

39

39

3 500.0

136 500.0

Subtotal

270

39

50

89

3 435 516.0

Freight at 15 per cent

515 327.4

Subtotal

3 950 843.4

Provided through surplus stock

Subtotal, line 3 (a)

270

39

50

89

3 950 843.4

(b) Rental of vehicles

(c) Workshop equipmentb

Civilian vehicle workshop

81 950.0

Military vehicle workshop

15 500.0

Subtotal, line 3 (c)

97 450.0

Total, line 3

270

39

50

89

4 048 293.4

4. Air operations

5. Naval operations

6. Communications

(a) Complementary communications

Communications equipment

VHF equipment

Mobile radio, general

386

10

10

600.0

6 000.0

Repeater, general

41

2

2

2 000.0

4 000.0

Base station, general

294

5

5

1 000.0

5 000.0

Satellite equipment

Transceiverb

1

1

55 000.0

55 000.0

Military pattern communications equipment

Battery charger

9

9

54.0

486.0

Telephone equipment

Rural telephone link

38

1

1

8 600.0

8 600.0

Microwave link

3

2

2

25 000.0

50 000.0

Field telephone

362

50

50

400.0

20 000.0

Cellular phoneb

10

10

500.0

5 000.0

Subtotal, line 6 (a)

1 124

79

11

90

154 086.0

(b) Spare parts and supplies

Civilian communications workshop

42 000.0

Military communications workshop

8 900.0

Subtotal, line 6 (b)

50 900.0

Total, line 6

1 124

79

11

90

204 986.0

7. Other equipment

(a) Office furniture

Rotary chair, with armsb

272

34

34

60.0

2 040.0

Rotary chair, without armsb

5

5

46.0

230.0

Computer desk, simpleb

127

13

13

31.0

403.0

Computer desk, expandedb

2

2

141.0

282.0

Filing cabinet, 2-drawer

54

11

11

108.0

1 188.0

Filing cabinet, 4-drawer

217

13

13

141.0

1 833.0

Metal bookshelfb

262

2

2

52.0

104.0

Table, office

267

5

5

60.0

300.0

Workstationb

7

7

500.0

3 500.0

Bookshelf, woodb

14

2

2

102.0

204.0

Chair, executiveb

25

2

2

52.0

104.0

Deskb

107

16

16

102.0

1 632.0

Subtotal, line 7 (a)

1 345

112

112

11 820.0

(b) Office equipment

Copier, large

16

1

1

6 000.0

6 000.0

Fax machine

45

5

5

1 300.0

6 500.0

Subtotal, line 7 (b)

61

6

6

12 500.0

Total, line 7

1 406

118

118

24 320.0

8. (a) Electronic data-processing equipment

Desktop

30

1 550.0

Desktop, Pentium

291

1 550.0

Hubs, 12 ports

1

1

12 000.0

12 000.0

Hubs, 24 ports

2

2

6 000.0

12 000.0

Hubs, 36 ports

2

2

3 500.0

7 000.0

Servers

11

1

1

2

4 200.0

8 400.0

Scanner

1

2

2

1 300.0

2 600.0

Uninterruptible power supply, large, 1,000-1,200 VA

28

100

100

550.0

55 000.0

Laptops, Pentium

3

2 300.0

Printers, high-speed

3

2 900.0

Panorama digital camerab

3

3

1 100.0

3 300.0

Printers, low-speed

35

700.0

IDTEL camera for ID systemb

2

2

900.0

1 800.0

Datacard image III printer for ID systemb

2

2

14 000.0

28 000.0

Computer projectorb

1

2

2

9 500.0

19 000.0

HP4500 colour laser-jet printerb

2

2

4 500.0

9 000.0

Panasonic printersb

3

2

2

300.0

600.0

Monitor, colour, 17@ screenb

213.0

Fibre optic hot-melt termination kitb

1

1

2 000.0

2 000.0

Fibre optic SC couplers, connectors, breakout kits, couplingsb

1

1

2 000.0

2 000.0

Fibre optic test setb

2

2

3 000.0

6 000.0

IGB Etherlink server network interface cardb`

7

7

950.0

6 650.0

100 MB PCI network interface card b

30

30

90.0

2 700.0

Multimode fibre optic cable (metre)b

1 000

1 000

9.0

9 000.0

100 MB UTP cable (metre)b

2 000

2 000

2.0

4 000.0

100 MB UTP cable connectors, modular plugs, wall mount b

1

1 500.0

1 500.0

Outlets,  patch cables and  tools

1 500.0

Subtotal, line 8 (a)

406

105

3 058

3 164

192 550.0

(b) Electronic data-processing systems

MS Windows 2000,  for serverb

4

4

800.0

3 200.0

MS  Windows 2000,  for workstation OS, 250 licencesb

3 000.0

3 000.0

MS Windows 2000, German version, 45 licencesb

500.0

500.0

MS Windows 2000, Arabic version, 10 licencesb

200.0

200.0

MS Office Professional 2000, 250 licencesb

2 000.0

2 000.0

Microsoft server management system software (SMS)b

2 000.0

2 000.0

Microsoft SQL server versionb

3 500.0

3 500.0

Drive image professional softwareb

2 000.0

2 000.0

Back-up software, ARC server for NT Enterprise Solution Windows NTb

1 000.0

1 000.0

Magic Software for Reality procurement, 50 licencesb

1 500.0

1 500.0

Btrieve, database file management software, 50 licences for Reality and Sun Systemsb

3 000.0

4 500.0

IDTEL for Windows NT versionb

4 500.0

4 500.0

AUTOCAD software for Ausbatt engineerb

7 000.0

7 000.0

Learning software (Windows and MS Office Professional 2000)b

3 000.0

3 000.0

Subtotal, line 8 (b)

4

4

37 900.0

(c) Generators

(d) Observation equipment

Binocular, 7 x 42b

125

8

8

220.0

1 760.0

Binocular, 7 x 50b

32

8

8

290.0

2 320.0

Binocular, 20 x 120b

43

3

3

2 160.0

6 480.0

Night observation devices (NOD)

102

15

15

3 975.0

59 625.0

Searchlight, FR300 – for electronic operating devices (EOD)b

55

4

4

1 952.0

7 808.0

Tripod for searchlight – for EODb

4

4

244.0

976.0

Cable reel for searchlight – for EODb

4

4

976.0

3 904.0

Chargers, 12 volts – for EOD

4

4

232.0

928.0

Battery pack – for EODb

4

4

270.0

1 080.0

NOD, long-rangeb

101

1

1

10 000.0

10 000.0

Maglightb

40

40

94.0

 3 760.0

Compassb

40

40

60.0

2 400.0

Subtotal, line 8 (d)

458

135

135

101 041.0

(e) Medical and dental equipmentb

87 500.0

(f) Accommodation equipmentb

133 500.0

(g) Miscellaneous equipmentb

39 500.0

Subtotal, line 8

864

240

3 062

3 303

591 991.0

Total, category I

3 664

476

3 126

3 603

5 394 090.4

II. Other programmes

Total, categories I and II

3 664

476

3 126

3 603

5 394 090.4

a No standard cost exists for this item.

b As contained in the mission inventory report as at 30 June 1999.

Annex III

Implementation of previous recommendations of the Advisory Committee on Administrative and Budgetary Questions

Request

Response

Unliquidated obligations as of 31 December 1998 for the period 1997/98 were reported at $16.8 million. However, upon enquiry, the Committee was informed that, as of 24 February 1999, they had been reduced to $3.9 million. In that connection, the Committee reiterated its views contained in its previous report (A/52/860) and its recommendation regarding the need to ensure timely and regular review of unliquidated obligations (A/53/895/Add.1, para. 6).

Unliquidated obligations are being reviewed on a monthly basis within the mission in order to keep them to a minimum.

The Committee recommended that a study be made to determine the most effective way of disposing of unusable vehicles, and urged regional cooperation among UNTSO, UNIFIL, UNDOF and UNFICYP (A/53/895, para. 40).

Discussions have taken place between the respective chief administrative officers and the topic is under review.

During the meetings held on 22 and 23 February 1996 on the financing of UNDOF and  UNIFIL, the Advisory Committee had requested that information be provided on the estimated cost to the United Nations Truce Supervision Organization (UNTSO) of direct support to UNDOF and UNIFIL. Since then, the Secretariat has been providing such information on a regular basis. The table below provides requisite information for the bienniums 1998/1999 and 2000/2001:

United Nations Truce Supervision Organization: estimates of direct support provided to the United Nations Disengagement Observer Force for the period from 1 January 1998 to 31 December 2001

(Thousands of United States dollars)

1998/1999

2000/2001

1. Posts

1 879.6

1 828.8

2. Other staff costs

4 395.6

4 351.5

3. Travel

1 514.7

1 555.9

4. General operating expenses

283.5

362.4

5. Supplies and material

204.4

131.7

6. Equipment

625.5

152.1

Total

8 903.3

8 382.4

Annex IV

Organization chart


Document symbol: A/54/732
Document Type: Report
Document Sources: General Assembly, Secretary-General, United Nations Disengagement Observer Force (UNDOF)
Subject: Peacekeeping
Publication Date: 01/02/2000
2019-03-11T21:08:03-04:00

Share This Page, Choose Your Platform!

Go to Top