{"id":198596,"date":"2005-05-20T00:00:00","date_gmt":"2019-03-12T17:37:51","guid":{"rendered":"https:\/\/www.un.org\/unispal\/?p=198596"},"modified":"2019-03-12T17:37:51","modified_gmt":"2019-03-12T17:37:51","slug":"auto-insert-198596","status":"publish","type":"document","link":"https:\/\/www.un.org\/unispal\/document\/auto-insert-198596\/","title":{"rendered":"USAID begins repairing seven critical West Bank roads &#8211; USAID press release\/Non-UN document"},"content":{"rendered":"<div>\n<div>\n<p style=\"margin-top:0px;margin-bottom:0px;\">\n<hr height=\"7px\" \/>\n<\/p><\/div>\n<div style=\"text-align:left;padding-top:10px;margin-left:20px;\">\n\t\t\t\t<span style=\"color:#000000;font-size:15pt;font-family:Arial, san-serif;\"><strong>USAID begins repairing seven critical West Bank roads<\/strong><\/span>\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\t<strong>RAMALLAH, WEST Bank &#8211;<\/strong>&nbsp;The American government launched an ambitious $12 million road reconstruction program Friday to improve commerce and traffic between West Bank communities.\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\tThe road renovation project is one of the development projects that the U.S. Agency for International Development (USAID) is accelerating as a sign of America&#39;s commitment to support the democratically-elected Palestinian leadership.\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\tIn consultation with the Palestinian Ministry of Planning and the Palestinian Ministry of Public Works and Housing, seven key roads totaling 38.5 kilometers were selected for reconstruction.\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\tThe project will benefit more than 200,000 people and create new employment opportunities for an estimated 500 Palestinians. The reconstruction work will require about 20,000 person-days of employment.\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\t&quot;These roads will be designed and constructed by local Palestinian engineering and construction firms to the highest quality standards,&quot; said Alvin Newman, Director of USAID&#39;s Infrastructure Office. &quot;We hope that they will be a lasting example of cooperation between the American and the Palestinian people.\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\t&quot;Palestinians often tell us that watching the construction of a beautiful new road is one of the best morale boosters in the world because roads augur good things to come in the future,&quot; he added.\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\tThe roads selected for reconstruction are:\n\t\t\t\t<\/div>\n<ul type=\"disc\" style=\"margin-left:-20px;margin-top:0px;margin-bottom:0px;\">\n<li style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;\">Qalandiah-Al Beireh Road, Ramallah District, 2.5 kilometers <\/li>\n<li style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;\">Road 60-Arabah to Jabaa-intersection, Jenin District, 8 kilometers <\/li>\n<li style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;\">Soureef-Kharas Road, Hebron District, 8 kilometers <\/li>\n<li style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;\">Tulkarem-Anabta Road, Tulkarem District, 5 kilometers <\/li>\n<li style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;\">Tubas-Al Faraa Road, Tubas District, 8 kilometers <\/li>\n<li style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;\">Beit O&#39;ur-Beit Loqya, Ramallah District, 4 kilometers <\/li>\n<li style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;\">Yaa&#39;bad Main Road, Jenin District, 3 kilometers<\/li>\n<\/ul>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\t<br \/>\nThe Ministry of Planning gave top priority to repairs on the Qalandia-Al Bireh road, which is heavily trafficked by people from all over the West Bank and is the main entry into Jerusalem. The road passes through a low area and is often badly flooded during the winter months. Currently, it is in terrible condition and in need of urgent reconstruction.\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\tUSAID plans to turn the Qalandia-Al Bireh route into a showcase road, with storm water control, improved utilities, sidewalks and beautification elements.\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\tThe roads project should be in full swing by late May when reconstruction of the road between Kharas and Soureef is scheduled to begin.\n\t\t\t\t<\/div>\n<div style=\"color:#000000;text-align:left;padding-top:10px;font-size:10pt;font-family:Arial, san-serif;margin-left:20px;\">\n\t\t\t\tContractors who have been chosen to implement the projects, under the supervision of the U.S. engineering firm CH2M Hill, include Al Tariffi, Saqqa &amp; Khoudary, Ocean Contracting and Saqqa &amp; Koudary Joint Venture.\n\t\t\t\t<\/div>\n<div style=\"text-align:left;padding-top:10px;margin-left:20px;\">\n\t\t\t\t<span style=\"color:#000000;font-size:10pt;font-family:Arial, san-serif;\">USAID has spent more than $1.5 billion in the West Bank and Gaza to combat poverty, create jobs, improve education, build roads and water systems, construct and equip medical clinics, and promote good governance. <\/span>\n\t\t\t\t<\/div>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>USAID begins repairing seven critical West Bank roads RAMALLAH, WEST Bank &#8211;&nbsp;The American government launched an ambitious $12 million road reconstruction program Friday to improve commerce and traffic between West Bank communities. The road renovation project is one of the development projects that the U.S. Agency for International Development (USAID) is accelerating as a sign <a href=\"https:\/\/www.un.org\/unispal\/document\/auto-insert-198596\/\"> [&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"template":"","meta":{"footnotes":""},"country":[2553],"document-category":[1329],"document-source":[],"committee-meeting":[],"document-subject":[1945,1749,2097],"entity":[1985],"document-language":[6542],"class_list":["post-198596","document","type-document","status-publish","hentry","country-united-states-of-america","document-category-press-release","document-subject-assistance","document-subject-palestine-question","document-subject-social-issues","entity-state","document-language-english"],"_links":{"self":[{"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/document\/198596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/document"}],"about":[{"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/types\/document"}],"author":[{"embeddable":true,"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/document\/198596\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/media?parent=198596"}],"wp:term":[{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/country?post=198596"},{"taxonomy":"document-category","embeddable":true,"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/document-category?post=198596"},{"taxonomy":"document-source","embeddable":true,"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/document-source?post=198596"},{"taxonomy":"committee-meeting","embeddable":true,"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/committee-meeting?post=198596"},{"taxonomy":"document-subject","embeddable":true,"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/document-subject?post=198596"},{"taxonomy":"entity","embeddable":true,"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/entity?post=198596"},{"taxonomy":"document-language","embeddable":true,"href":"https:\/\/www.un.org\/unispal\/wp-json\/wp\/v2\/document-language?post=198596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}