Quantity/Term, Estimated Value and Estimated Quarter for each procurement are approximate indicators only. Factors such as availability, project increase or decrease may impact the actual requirement.
Vendors interested in registering with the United Nations Procurement Division Supplier Database must submit an application along with detailed information demonstrating experience and qualifications in provision of the relevant commodities/services.
| Commodity |
Description |
Qty/Term |
Est. Value |
Est. Qtr |
| Communications |
Server Bank, Blade System - High |
1 |
$50,000 |
2 |
| |
Toner Cartridges |
1 lot |
$60,000 |
1 |
| |
Fiber redundant ring to new DRBC |
1 |
$40,000 |
2 |
| |
UHF Mototrbo Equipment |
1 lot |
$45,100 |
1,2 |
| |
Self Supporting Tower |
1 |
$85,000 |
|
| |
Spare Parts |
TBD |
$109,224 |
1,2,3,4 |
| Engineering |
A long term plan for the renovation of Sector 4 HQ / Camp General Stefanik located in the north of the Island has be established. This 3-year project is intendws to tackle the disintergrating TCC accommodation. |
LOT |
$152,478 |
2 |
| |
Road and hard standing infrastructure maintenance has been postponed for a number of budget cycles, due to continuing deteriorating condition. Resurfacing of the roads / hard stands is required before they degrade further. |
LOT |
$109,920 |
3 |
| |
Materials for maintenance of patrol track at along the 270 km of major UN patrol track in the BZ. Continuous maintenance is required throughout the total BZ. Major renovation is planned where work will be carried out by HQ Engineers. |
LOT |
$125,000 |
2 |
| MEDICAL |
MEDICAL SUPPLIES (5589) |
TBD |
$107,100 |
1,2,3,4 |
| SUPPLY |
Provision of unskilled labour |
TBD |
$42,135 |
1 |
| |
CCTV Maintenance / Spare Parts |
TBD |
$69,257 |
1,2,3,4 |
| |
Laundry / Dry Cleaning Services |
TBD |
$149,000 |
1,2,3,4 |
| |
Advertisements |
TBD |
$82,750 |
1,2,3,4 |
| |
Equipment and Supplies |
TBD |
$92,000 |
TBD |
| |
Grounds Maintenance (4113) |
TBD |
$42,100 |
1 |
| |
Gas (4205) |
TBD |
$65,700 |
1 |
| |
Security and Safety Equipment (5345) |
TBD |
$114,500 |
2 |
| TRANSPORT |
Sedan LT |
30 |
$157,759.00 |
1, 2, 3, 4 |
| |
Mini Bus 9-12 seater |
4 |
$49,545.00 |
1, 2, 3, 4 |
| |
Med. Bus 24-30 seater |
5 |
$108,709.00 |
1, 2, 3, 4 |
| |
Delivery Van |
7 |
$62,533.00 |
1, 2, 3, 4 |
| |
Pick-up 4x4 |
146 |
$1,602,981.00 |
1, 2, 3, 4 |
| |
Refrigerated Van Med. |
4 |
$81,787.00 |
1, 2, 3, 4 |
| |
Aviation fuel |
244760 |
$226,186 |
1, 2, 3, 4 |
| |
Compulsory local third party insurance for UNOE/COE (106) 2 months |
TBD |
$41,307 |
1, 2, 3, 4 |
| |
Petrol (South) for vehicles |
62,000 |
$43,910 |
1, 2, 3, 4 |
| |
Diesel (South) for vehicles |
760,000 |
$535,732 |
1, 2, 3, 4 |
| |
Diesel (North) for vehicles in Sector 4 |
117,614 |
$131,873 |
1, 2, 3, 4 |
| |
Maintenance/repair contract Toyota Amb/Med Bus/ Prados |
42 |
$60,000.00 |
1, 2, 3, 4 |
| |
Maintenance/repair of engineering equipment |
13 |
$50,000.00 |
1, 2, 3, 4 |
| |
Tyres Supply and Repairs |
TBD |
$60,000.00 |
1, 2, 3, 4 |
| |
Accident damage repairs/write-off for Hired vehicles |
TBD |
$250,000.00 |
1, 2, 3, 4 |
| |
Diesel for generators |
140000 |
$103,403 |
1, 2, 3, 4 |
| |
Fuel for heating oil |
190000 |
$138,576 |
1, 2, 3, 4 |
|