Commodity Description Qty/Term Est. Value Est. Qtr
TPT Bulk Fuel Delevery HQ, & OGGT.   
$146,600.00
1
Pazomat Fuel at Pumps in Israel  
$85,000.00
1
Parts for Toyota Vehicles
$33,200.00
1
Compulsory vehicle Insurance for vehicles 
$59,700.00
1,3
TOYOTA PRADOS
$300,000.00
3
Information Technology Desktop PC's
50
$30,000.00
2
High-Perf Servers
16
$96,000.00
2
CISCO Switches, Routers, firewall equipment
25
$113,000.00
1
Cisco WAAS eqpt
1
$35,000.00
1
Network Testing Equipment
1
$30,000.00
1
Communication Communications/Spectrum/Datacom/Microwave Analysers
11
$228,500.00
1-3
VHF/UHF Mobiles and Handy Talkies
804
$888,000.00
1
Microwave Link
10
$200,000.00
2
VSAT components
11
$347,600.00
MOVCON Carton boxes size "A" and "B"
Jan-Dec10
$58,000.00
2
Tiberias Office and Workshop: Provision of $56,200 is made for the rental of a 400 m2 facility in Tiberias. As UNDOF ceased cost-sharing arrangements for the facility, the full cost to UNTSO is based on a monthly cost of $4,680. Current lease expires on 30 June 2009.
Jan-Dec10
$56,200.00
2
Structural Repair of General Service Section Building: Rectification of structural damage due to ground settlements
Jan-Dec10
$70,000.00
4
Survey of Underground Utility lines: Survey to determine extent of damage to the aged ( 60years) underground utility lines ( water & sewage) to avoid the consistent continual bursting of the lines and programme for repairs in a planned manner
Jan-Dec10
$35,000.00
4
  Construction of stone retaining walls to support the soil at north parking area: Retaining wall to be constructed at north parking area to stabilize and prevent collapse of the soil. The height of retaining wall to follow the slope of soil (varies) for max. of 226 meter @ $300/m.Health & Safety Project as per UNTSO Risk Register
Jan-Dec10
$64,200.00
4
Additional office space in CWH: To expand the office space at CWH for an additional 28 sq. meter area to accommodate 4 additional staff.
Jan-Dec10
$35,000.00
4
Structural Analysis on the condition of GH Buildings by seismic consultant: To conduct a structural analysis study on current condition of the GH Building as result of recent earthquake.
Jan-Dec10
$45,000.00
4
Upgrade and replacement of street/security lighting and poles within HQ Compound: To replace and install 153 new poles around the perimeter of GH. The work shall include excavation of footings, trenches between the poles for an approximate perimeter of 1400 meter. The cost is estimated @ $ 286/pole totaling $400,000. The work has to be phased over 4 years (two biennium) commencing on 2010.
Jan-Dec10
$120,500.00
4
Assessment of internal  electrical cable distribution system within UNTSO HQ compound: To assess the underground electrical grid, power factor correction, switch boards and building wiring due to the age of the wires and increased load on the electrical system.
Jan-Dec10
$35,000.00
4
Cleaning of the exterior of main Government House building and Main Gate complex: To sandblast the exterior façade of the main building in order to remove residuals from historical stone.
Jan-Dec10
$63,700.00
4
Upgrade of gardens and grounds at UNTSO HQ Compound: Nine gardens with a total area of 34,647 sq. meter to be upgraded and stone pathways to be restored and arranged
Jan-Dec10
$150,000.00
4
Improve all temporary structures (offices, workshops and stores) at UNTSO HQ compound: To improve and rehabilitate the buildings around TPT workshop (9898.67 sq.m.), central warehouse (420 sq.m), and car wash area (100 sq.m.) and the Carpentry workshop (298.42 sq. m.). T
Jan-Dec10
$250,000.00
4
Covered parking for VIP vehicles: To build covered parking at east parking area for VIP and visitors
Jan-Dec10
$30,000.00
4
New Perimeter/Security fence for 5 Ops in OGG-D: Erection and installation of new Perimeter fence at five OPs for a total length of 1,056 L.M. This project is listed under Health & Safety Project as per UNTSO Risk Register 
Jan-Dec10
$52,800.00
4
Installation of secondary roof in BP West (UNIFIL Position 2-45): Construct roofing over open area between Ops Room / kitchen and accommodation areas in order to prevent rain and snow during winter months. 
Jan-Dec10
$61,200.00
4
New Perimeter/Security Fence at PB's East and West and Armed Gates: Construct a fence around the perimeter of OGL area in order to provide local security.
Jan-Dec10
$65,000.00
4
Construction of Observation towers on 5 Ops: Erection and installation of observation towers on steel pillars. The erection and installation of an observation tower is estimated @ $ 65,000. Work to be conducted simultaneously on 5 OPs.
Jan-Dec10
$325,000.00
4
Construction of new foundations and sanitation work at OP 54, OP 55 and OP 73: To build footings and sanitation on OP 55 and 73 prior to the installation of the prefabs.
Jan-Dec10
$73,000.00
4

 

2010 Acquisition Plan
Communications
Construction/Engineering/Refurbishment
Information Technology
Office Supplies/Equipment/Furniture
Printing Services
Trade & Business Services
Vehicles
Miscellaneous
 
2009-10 Acquisition Plan - Field Missions
MINURSO UNLB
MINUSTAH UNMEE
MONUC UNMIK
ONUCI UNMIL
UNDOF UNMIS
UNFICYP UNMIT
UNIFIL UNOMIG
     
2010 United Nations Political Missions
BINUB UNMIN
BONUCA UNMOGIP
UNAMA UNOGBIS
UNAMI UNSCO
UNIOSIL UNTSO
   

 

380 Madison Avenue 2nd Floor New York, NY 10017 General Info.: (212) 963-6249 Fax No.: (212) 963-0377
Terms of Use